COMPLETE BATHROOM ADDITION TO 3rd FLOOR - START TO FINISH

Prep For Plumbing Rough In
Vanity Sink, Shower And Commode PVC Drains
Copper Plumbing Lines, PVC Vent Stack And Electrical Box
Hot And Cold Copper Lines For Shower
Sewer And Water Drains Ran To Basement Down Old Clothes Chute
36" Shower Unit Set Up And Walls Preped For Paint
Installation Of New 12" X 12" Ceramic Tile Floor
New Vanity, Mirror And Trim
Complete Bathroom Installed And Finished